University of Texas at El Paso Engineering Complex Addition

P3161053
P3161053
P3161050
P3161056
P3161089
P3161090
P3161093
P3161066
P3161075
P3161084
Utep-view_11
Location
Hawthorne Street on the U.T.E.P. campus
Size
42,000 s.f. +
Budget
All three phases $7,500,000.00
Completion
Final of Phase 3 was April of 2008
Owner
University of Texas at El Paso
Client Contact
Mr. Greg McNicol, AIA
University of Texas at El Paso
915-747-7182

The U.T.E.P. Engineering Complex Addition is a three story Administration and Office wing to the east of the existing Engineering Complex. The facility has a half basement which houses the mechanical systems and a Materials Testing Lab.
The 42,000 S.F. addition was constructed in 3 phases, with the 1st phase being the shell of the buliding and the finish out ot the 3rd floor faculty offices and Engineering Department offices for Electrical/Computer Engineering. This was completed in 2004.
Phase 2 was the second floor build-out of faculty offices and Department offices for Civil Engineering and offices for Metallurgical Engineering and was completed in 2006.
The final phase was the Interior completion of the 1st floor. It was comprised of the Dean of Engineering Suite, offices for the Departments of Mechanical/Industrial Engineering and faculty offices. Additional spaces included two large meeting spaces and a large presentation/conference room. Completion was 2008.